Much progress was made despite another windy day. There was activity in all corners of the clinic today - retrofitting existing doors, the continuation of the electrical buildout, signage repairs and painting, lock and hinge replacements, cabinetry construction, and several other renovations. See a portion of today's activity below:
Winds were again consistently 50 mph with periodic gusts even greater. This wind provided challenges, whether we were repairing the side of the roof, painting, or even during door repairs (as seen below).
Return to the blog tomorrow evening to see video footage of the clinics new lighting system.